CTH BB over OCONTO RIVER

2.4M S JCT STH 22 · County 083, Wisconsin · Built 1973 · 2 Lanes · 540 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B42002000000000
Year Built
1973
Reconstructed
2020
Length
40.2 m (131.9 ft)
Max Span
39.6 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
540
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.