CTH PP over E FK LEMONWEIR RIVER

0.5M S JCT STH 21 · County 081, Wisconsin · Built 1997 · 2 Lanes · 545 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B41021100000000
Year Built
1997
Length
21.5 m (70.5 ft)
Max Span
10.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
545
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.