CTH PP over IH 90-IH 94
0.2M N JCT USH 12 · County 081, Wisconsin · Built 1963 · 2 Lanes · 6,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.962739, -90.377719
This bridge is in worse condition than 80.7% of bridges in County 081. The average bridge in Wisconsin is 0 years old; this one is 63 years old.
Nearby Bridges
USH 12-STH 16 over INDIAN CREEK
Built 1992
IH 90 EB-IH 94 EB over ALLEN CREEK
Built 1963
IH 90 WB-IH 94 WB over ALLEN CREEK
Built 1963
CTH PP over BEAR CREEK
Built 2011
IH 90-IH 94 over BEAR CREEK
Built 1963
CTH N over IH 90-IH 94
Built 1963
LRD GROVER ROAD over BR ALLEN CREEK
Built 1963
LRD GROVER ROAD over IH 90 WB-IH 94 WB
Built 2009
LRD GROVER ROAD over IH 90 EB-IH 94 EB
Built 2009
LRD GROVER RD over ALLEN CREEK
Built 1976
Bridge Details
- Structure #
- B41003800000000
- Year Built
- 1963
- Length
- 73.7 m (241.8 ft)
- Max Span
- 25.1 m
- Width
- 14.5 m (47.6 ft)
- Lanes
- 2
- Daily Traffic
- 6,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $971,000
- Total Project Cost
- $1,456,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.