STH 241/27TH ST NB over IH 41/43/894
AT IH43 XING · County 079, Wisconsin · Built 2009 · 3 Lanes · 18,650 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
42.962292, -87.94845
This bridge is in worse condition than 18.2% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 17 years old.
Nearby Bridges
STH 241 SB/ S 27TH over IH 41/43/894
Built 2009
IH RAMP STH 241 NB over IH 41/43/894
Built 2011
IH RAMP STH 241 SB over IH 41/43/894
Built 2011
LRD W BOLIVAR AVE over BR KINNICKINNIC RIVER
Built 1966
LRD S 20TH ST over IH 41/43/894
Built 2011
LRD S 35TH ST over IH 41/43/894
Built 1966
IH 41 over IH 43 NB
Built 2011
LRD PLAINFIELD AVE over BR KINNICKINNIC RIVER
Built 1967
IH41/94 NB & SB over IH RAMP SW IH41/94 NB TO
Built 2012
IH RAMP IH 43 SB/9 over IH 41 SB
Built 2012
Bridge Details
- Structure #
- B40083600000000
- Year Built
- 2009
- Length
- 115.9 m (380.2 ft)
- Max Span
- 31.7 m
- Width
- 16 m (52.5 ft)
- Lanes
- 3
- Daily Traffic
- 18,650
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.