STH 100 SB over IH 94

0.4 MI S JCT USH 18 · County 079, Wisconsin · Built 2014 · 3 Lanes · 12,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B40077000000000
Year Built
2014
Length
124.8 m (409.4 ft)
Max Span
27.7 m
Width
21.7 m (71.2 ft)
Lanes
3
Daily Traffic
12,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,062,000
Total Project Cost
$3,093,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.