STH 100 SB over IH 94
0.4 MI S JCT USH 18 · County 079, Wisconsin · Built 2014 · 3 Lanes · 12,650 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.029539, -88.047439
This bridge is in worse condition than 18.2% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 12 years old.
Nearby Bridges
STH 100 NB over IH 94
Built 2014
STH 100 SB-S 108TH over HAST (ABANDONED CMSTPP R
Built 1961
STH 100 NB-S 108TH over HAST (ABANDONED CMSTPP R
Built 1961
IH RAMP STH 100 - over IH 94
Built 2014
IH RAMP IH 94 EB over LRD RAMP STH 100 - IH 9
Built 2016
IH RAMP I-94 WB - over LRD SERVICE RD
Built 2015
IH RAMP STH 100 - over LRD ZOO ACCESS ROAD TUNN
Built 2014
USH 18-STH 100 over CNW RR
Built 1973
IH RAMP WN IH 94 over IH 41/USH 45
Built 2017
IH RAMP IH 41/USH over IH RAMP IH 94 WB - STH
Built 2015
Bridge Details
- Structure #
- B40077000000000
- Year Built
- 2014
- Length
- 124.8 m (409.4 ft)
- Max Span
- 27.7 m
- Width
- 21.7 m (71.2 ft)
- Lanes
- 3
- Daily Traffic
- 12,650
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,062,000
- Total Project Cost
- $3,093,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.