LRD 29TH STREET over UNION PACIFIC RR

1.0M STH59 · County 079, Wisconsin · Built 2008 · 2 Lanes · 1,296 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B40071800000000
Year Built
2008
Length
21.3 m (69.9 ft)
Max Span
21 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
1,296
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.