LRD N 35TH ST over CANADIAN PACIFIC RR
0.2M N JCT USH 18 · County 079, Wisconsin · Built 1991 · 4 Lanes · 13,667 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.047589, -87.957558
This bridge is in worse condition than 68.5% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 35 years old.
Nearby Bridges
LRD W VLIET ST over CANADIAN PACIFIC RR
Built 1988
LRD CHERRY ST over CP RAILROAD
Built 1998
LRD WEST GALENA ST over C. P. RAILROAD
Built 1999
LRD W HIGHLAND BLV over CANADIAN PACIFIC RR
Built 2009
LRD W WALNUT ST over CANADIAN PACIFIC RR
Built 1996
LRD W LISBON AVE over CANADIAN PACIFIC RR
Built 2014
LRD W BROWN ST over CANADIAN PACIFIC RR
Built 2018
LRD W VLIET ST over STH 175-STADIUM FREEWAY
Built 1959
LRD W BLUE MOUND R over MENOMONEE RIVER
Built 1985
LRD N 45TH ST (DEA over MENOMONEE RIVER
Built 1952
Bridge Details
- Structure #
- B40056800000000
- Year Built
- 1991
- Length
- 21.9 m (71.9 ft)
- Max Span
- 20.5 m
- Width
- 19.5 m (64 ft)
- Lanes
- 4
- Daily Traffic
- 13,667
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $421,000
- Total Project Cost
- $632,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.