LRD E NORTH AVE over OAK LEAF BIKE TRAIL (ABA

0.1M W JCT STH 32 · County 079, Wisconsin · Built 1925 · 3 Lanes · 17,300 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B40050200000000
Year Built
1925
Reconstructed
1975
Length
30.4 m (99.7 ft)
Max Span
28 m
Width
20.3 m (66.6 ft)
Lanes
3
Daily Traffic
17,300
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.