STH 175-APPLETON A over MENOMONEE RIVER

1.0M N JCT USH 45 · County 079, Wisconsin · Built 1971 · 4 Lanes · 13,900 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B40040200000000
Year Built
1971
Reconstructed
2023
Length
48.9 m (160.4 ft)
Max Span
15.9 m
Width
14 m (45.9 ft)
Lanes
4
Daily Traffic
13,900
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$852,000
Total Project Cost
$1,278,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.