IH RAMP IH 794 WB over LAND
1.0 MI E JCT IH-43 · County 079, Wisconsin · Built 1975 · 2 Lanes · 2,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.036081, -87.905094
This bridge is in worse condition than 40.6% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 51 years old.
Nearby Bridges
IH ON-RAMP JACKSO over STH 32 / MILWAUKEE ST
Built 2015
IH 794 WB-LAKE INT over LAND - PARKING LOT
Built 1975
IH 794 WB-E-W FREE over IH RAMP IH 794WB-MILW ST
Built 1975
IH 794 EB over LAND
Built 1974
IH RAMP BROADWAY over LAND
Built 1974
IH 794 WB-E-W-FREE over IH RAMP IH 794 WB - STH
Built 1975
IH RAMP IH 794WB over IH RAMP JACKSON ST-IH 7
Built 1975
IH RAMP BROADWAY over LAND
Built 1974
IH 794 EB over STH 32/MILWAUKEE ST
Built 1974
IH 794 WB-LAKE INT over LRD N JACKSON ST
Built 1975
Bridge Details
- Structure #
- B400400007B0000
- Year Built
- 1975
- Length
- 59.3 m (194.6 ft)
- Max Span
- 7.8 m
- Width
- 9.7 m (31.8 ft)
- Lanes
- 2
- Daily Traffic
- 2,600
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $792,000
- Total Project Cost
- $1,188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.