CTH EE|W HAMPTON A over IH-41|USH 45|ZOO FREEWAY
0.2M W OF JCT STH 100 · County 079, Wisconsin · Built 1967 · 5 Lanes · 32,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
43.104842, -88.057886
This bridge is in worse condition than 68.5% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 59 years old.
Nearby Bridges
CTH EE W HAMPTON over MENOMONEE RIVER
Built 2005
CTH EE - W HAMPTON over MENOMONEE RIVER
Built 2004
STH 100 SB-LOVERS over LITTLE MENOMONEE RIVER
Built 1968
IH 41/USH 45 NB-ZO over MENOMONEE RIVER
Built 2001
STH 100 NB-N LOVER over LITTLE MENOMONEE RIVER
Built 1968
CTH EE - HAMPTON A over UNION PACIFIC RR
Built 2004
IH 41 SB|USH 45 SB over MENOMONEE RIVER
Built 2000
CTH EE W HAMPTON over UNION PACIFIC RR
Built 2005
LRD N 124TH ST over MENOMONEE RIVER
Built 1994
IH 41/USH 45 SB-ZO over STH 100 SB-SILVER SPRING
Built 1967
Bridge Details
- Structure #
- B40036000000000
- Year Built
- 1967
- Length
- 51.4 m (168.6 ft)
- Max Span
- 25 m
- Width
- 35.4 m (116.1 ft)
- Lanes
- 5
- Daily Traffic
- 32,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $892,000
- Total Project Cost
- $1,339,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.