STH 38 NB-HOWELL A over OAK CREEK

0.3M N JCT STH 100 · County 079, Wisconsin · Built 1968 · 2 Lanes · 12,050 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B40029500000000
Year Built
1968
Length
32.7 m (107.3 ft)
Max Span
13.1 m
Width
15.1 m (49.5 ft)
Lanes
2
Daily Traffic
12,050
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.