IH 94 WB-IH 43 NB over BURNHAM CANAL

5.4M N JCT IH 894 · County 079, Wisconsin · Built 1968 · 4 Lanes · 78,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B40028527E10000
Year Built
1968
Reconstructed
1989
Length
174.3 m (571.9 ft)
Max Span
61.6 m
Width
19.6 m (64.3 ft)
Lanes
4
Daily Traffic
78,000
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.