CTH PP WB - W GOOD over STH 145

2.3 MI W JCT STH 181 · County 079, Wisconsin · Built 1964 · 3 Lanes · 20,250 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B40025100000000
Year Built
1964
Length
68.6 m (225.1 ft)
Max Span
23.5 m
Width
13.9 m (45.6 ft)
Lanes
3
Daily Traffic
20,250
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,166,000
Total Project Cost
$1,749,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.