STH 57-GREEN BAY A over BR MILWAUKEE RIVER

2.0M N JCT CTH PP · County 079, Wisconsin · Built 1963 · 3 Lanes · 7,100 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B40015500000000
Year Built
1963
Length
11.2 m (36.7 ft)
Max Span
10.4 m
Width
35.7 m (117.1 ft)
Lanes
3
Daily Traffic
7,100
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$251,000
Total Project Cost
$377,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.