STH 190-CAPITOL DR over IH 43-N-S FREEWAY
0.7M E JCT STH 57 TO S · County 079, Wisconsin · Built 1960 · 7 Lanes · 25,700 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
43.089433, -87.921636
This bridge is in worse condition than 68.5% of bridges in County 079. The average bridge in Wisconsin is 0 years old; this one is 66 years old.
Nearby Bridges
LRD DOCTOR MARTIN over IH 43
Built 1961
IH 43-N-S FREEWAY over RAMP IH 43NBL-STH 57
Built 1961
IH RAMP IH 43 SB over LRD RAMP 9TH ST SB-IH 4
Built 1961
IH RAMP IH 43 SB T over IH RAMP IH 43 NB TO STH
Built 2023
LRD N PORT WASHING over STH 190-CAPITOL DR
Built 2019
LRD W ATKINSON AVE over IH 43 (N-S FREEWAY)
Built 1960
LRD W KEEFE AVE over IH 43-N-S FREEWAY
Built 1963
IH 43 NB over LRD GLENDALE AVE
Built 2023
IH 43-NB PORT WASH over LRD GLENDALE AVE
Built 2022
IH 43 SB over LRD GLENDALE AVE
Built 2022
Bridge Details
- Structure #
- B40007400000000
- Year Built
- 1960
- Reconstructed
- 1995
- Length
- 53.3 m (174.9 ft)
- Max Span
- 17.6 m
- Width
- 35.8 m (117.5 ft)
- Lanes
- 7
- Daily Traffic
- 25,700
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $922,000
- Total Project Cost
- $1,383,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.