STH 57-GREEN BAY A over LRD W. SILVER SPRING DRI

2.1M N JCT STH 190 TO E · County 079, Wisconsin · Built 1957 · 4 Lanes · 15,582 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B40002800000000
Year Built
1957
Reconstructed
1999
Length
58.6 m (192.3 ft)
Max Span
16.5 m
Width
29.3 m (96.1 ft)
Lanes
4
Daily Traffic
15,582
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.