CTH P over NEENAH CREEK

0.5M W JCT CTH O · County 077, Wisconsin · Built 2004 · 2 Lanes · 166 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B39006500000000
Year Built
2004
Length
14.5 m (47.6 ft)
Max Span
13.7 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
166
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.