USH 8 over N BR PIKE RIVER

7.8M E JCT CTH H · County 075, Wisconsin · Built 1931 · 2 Lanes · 1,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B38091000000000
Year Built
1931
Length
10 m (32.8 ft)
Max Span
9.6 m
Width
30.5 m (100.1 ft)
Lanes
2
Daily Traffic
1,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.