LRD MATHIS RD over S BR PIKE RIVER

2.3M W JCT CTH V · County 075, Wisconsin · Built 1990 · 2 Lanes · 75 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
B38004400000000
Year Built
1990
Length
24.3 m (79.7 ft)
Max Span
23.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
75
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.