CTH L over STONEY CREEK

0.8M N JCT CTH H · County 073, Wisconsin · Built 2009 · 2 Lanes · 478 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B37041500000000
Year Built
2009
Length
14.2 m (46.6 ft)
Max Span
13.4 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
478
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.