STH 29 EB SYSTEM R over LRD STEWART AVE
AT STEWERT AVE · County 073, Wisconsin · Built 2010 · 1 Lanes · 3,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.957944, -89.66575
This bridge is in worse condition than 47.8% of bridges in County 073. The average bridge in Wisconsin is 0 years old; this one is 16 years old.
Nearby Bridges
USH 51 NB EXIT RAM over LRD STEWET AVE
Built 2010
USH 51NB over LRD STEWART AVE
Built 2009
USH 51 SB over LRD STEWART AVE
Built 2007
USH 51 SB ENTRANCE over LRD STEWART AVE
Built 2007
USH STH 29WB RAMP over STH STEWART AVE.
Built 2008
LRD STEWART AVE over TRIB TO RIB RIVER
Built 2000
USH RAMP USH51SB T over USH RAMP HWY 52 PARKWAY
Built 2008
USH 51NB over LRD HWY 52 PARKWAY
Built 2008
STH 29 WB SYSTEM R over LRD HWY 52 PARKWAY
Built 2008
USH 51 over USH 51
Built 2010
Bridge Details
- Structure #
- B37037100000000
- Year Built
- 2010
- Length
- 62.1 m (203.7 ft)
- Max Span
- 30.6 m
- Width
- 9 m (29.5 ft)
- Lanes
- 1
- Daily Traffic
- 3,000
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.