STH29EB TO USH 51N over STH 29
2.5M E JCT 72 AVE · County 073, Wisconsin · Built 2010 · 1 Lanes · 3,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.953333, -89.675194
This bridge is in worse condition than 26.4% of bridges in County 073. The average bridge in Wisconsin is 0 years old; this one is 16 years old.
Nearby Bridges
STH 29WB over STH RAMP TO STEWART AVE
Built 2007
STH 29EB over LRD RAMP TO STEWART AVEN
Built 2007
STH 29 EB over LRD 28TH AVENUE
Built 2008
STH 29 WB over LRD 28TH AVENUE
Built 2008
STH 29 over WCL
Built 2008
USH51NB TO STH29WB over CANADIAN NATIONAL RR
Built 2008
STH 29 RAMP over LRD 28TH AVE
Built 2008
STH 29 over LRD SHERMAN ST
Built 2008
USH 51 over USH 51
Built 2010
USH 51 SB over WISCONSIN CENTRAL RR
Built 2007
Bridge Details
- Structure #
- B37036200010000
- Year Built
- 2010
- Length
- 637.1 m (2090.2 ft)
- Max Span
- 43.3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 1
- Daily Traffic
- 3,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $7,958,000
- Total Project Cost
- $11,937,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.