CTH N over BIG EAU PLEINE RIVER

0.2M E JCT CTH F TO S · County 073, Wisconsin · Built 1961 · 2 Lanes · 1,106 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B37008300000000
Year Built
1961
Reconstructed
1996
Length
58.4 m (191.6 ft)
Max Span
21.6 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
1,106
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$669,000
Total Project Cost
$1,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.