STH 29 WB over PLOVER RIVER

0.05M W JCT CTH Y · County 073, Wisconsin · Built 1959 · 3 Lanes · 6,650 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B37004800000000
Year Built
1959
Reconstructed
2005
Length
18 m (59.1 ft)
Max Span
8.5 m
Width
20.7 m (67.9 ft)
Lanes
3
Daily Traffic
6,650
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.