CTH N over BIG SANDY CREEK

0.5M W JCT CTH SS · County 073, Wisconsin · Built 1959 · 2 Lanes · 4,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B37004500000000
Year Built
1959
Length
23.8 m (78.1 ft)
Max Span
9.1 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
4,000
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$528,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.