CTH P over BIG EAU PLEINE RIVER

1.5M E JCT CTH E TO W · County 073, Wisconsin · Built 1958 · 2 Lanes · 299 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
B37004400000000
Year Built
1958
Length
57.5 m (188.6 ft)
Max Span
28 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
299
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$880,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.