STH 153 over PLOVER RIVER

2.7M E JCT CTH J TO S · County 073, Wisconsin · Built 1955 · 2 Lanes · 970 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B37001900000000
Year Built
1955
Reconstructed
1989
Length
22.6 m (74.1 ft)
Max Span
21.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
970
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.