USH 10 WB over LRD WHITEWATER DR
0.5M E JCT IH43 TO N · County 071, Wisconsin · Built 1979 · 2 Lanes · 2,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
44.109125, -87.718272
This bridge is in worse condition than 80.1% of bridges in County 071. The average bridge in Wisconsin is 0 years old; this one is 47 years old.
Nearby Bridges
USH 10 EB over LRD WHITEWATER DR
Built 1979
LRD MICHIGAN AVE over MANITOWOC RIVER
Built 2006
USH 10 W over MANITOWOC RIVER
Built 1980
IH 43 NB over USH 10 EB
Built 1979
IH 43 SB over USH 10 EB
Built 1979
LRD MIDDLE RD over IH 43-STH 42
Built 1978
USH 10 E over MANITOWOC RIVER
Built 1980
CTH R/RAPIDS RD over MANITOWOC RIVER
Built 2019
LRD BROADWAY STREE over MANITOWOC RIVER
Built 1984
USH 10/WALDO BLVD over DRY RUN
Built 2020
Bridge Details
- Structure #
- B36011400000000
- Year Built
- 1979
- Length
- 39 m (128 ft)
- Max Span
- 38.1 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,900
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $540,000
- Total Project Cost
- $810,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.