CTH YY over NORTH FORK SPIRIT RIVER

0.23M N STH 86 · County 069, Wisconsin · Built 2022 · 2 Lanes · 366 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
9
Excellent

Bridge Details

Structure #
B35011800000000
Year Built
2022
Length
26.5 m (86.9 ft)
Max Span
25 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
366
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.