STH 11 over GALENA R

AT GALENA RIVER · County 065, Wisconsin · Built 2005 · 2 Lanes · 2,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
B33010500000000
Year Built
2005
Length
71.4 m (234.3 ft)
Max Span
35.1 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
2,900
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.