CTH O over BONNER BRANCH

1.9M N JCT CTH G · County 065, Wisconsin · Built 1990 · 2 Lanes · 160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
B33004100000000
Year Built
1990
Length
13.8 m (45.3 ft)
Max Span
13.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
160
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.