CTH F over VINEGAR BRANCH

1.4M W JCT STH 23 · County 065, Wisconsin · Built 1985 · 2 Lanes · 316 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good

Bridge Details

Structure #
B33003400000000
Year Built
1985
Length
12.5 m (41 ft)
Max Span
11.9 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
316
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.