CTH B over BOSTWICK CREEK

2 MI W OF JCT CTH M · County 063, Wisconsin · Built 2017 · 2 Lanes · 1,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B32023200000000
Year Built
2017
Length
44.8 m (147 ft)
Max Span
17.7 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
1,300
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.