CTH X over BERGE COULEE CREEK

0.1M N JCT CTH P · County 063, Wisconsin · Built 1995 · 2 Lanes · 295 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B32018500000000
Year Built
1995
Length
7.6 m (24.9 ft)
Max Span
7.3 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
295
Material
Wood or Timber
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.