CTH GI (DEAD END) over RUNNING SLOUGH

0.3M W JCT STH 35 · County 063, Wisconsin · Built 1978 · 2 Lanes · 640 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B32007600000000
Year Built
1978
Length
66.8 m (219.2 ft)
Max Span
33.1 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
640
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.