CTH B over IH 90

1.1M N JCT CTH BW · County 063, Wisconsin · Built 1967 · 2 Lanes · 7,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
B32005200000000
Year Built
1967
Reconstructed
2016
Length
68.4 m (224.4 ft)
Max Span
33.4 m
Width
20.1 m (65.9 ft)
Lanes
2
Daily Traffic
7,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.