CTH AB over RED RIVER

2.2M N JCT CTH S · County 061, Wisconsin · Built 1961 · 2 Lanes · 305 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
B31001300000000
Year Built
1961
Length
9.1 m (29.9 ft)
Max Span
8.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
305
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.