CTH B over PETERSON CREEK

0.4 MI S JCT CTH JB · County 059, Wisconsin · Built 2024 · 2 Lanes · 950 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
B30015400000000
Year Built
2024
Length
9.9 m (32.5 ft)
Max Span
9.1 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
950
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.