STH 158 EB over KILBOURN DITCH

0.1M E JCT IH 94 · County 059, Wisconsin · Built 2013 · 4 Lanes · 9,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B30011500000000
Year Built
2013
Length
16.4 m (53.8 ft)
Max Span
15.2 m
Width
25.9 m (85 ft)
Lanes
4
Daily Traffic
9,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.