STH 32 over PIKE RIVER

0.9M S JCT CTH E · County 059, Wisconsin · Built 2005 · 6 Lanes · 10,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

42.625411, -87.823575

This bridge is in worse condition than 37.3% of bridges in County 059. The average bridge in Wisconsin is 0 years old; this one is 21 years old.

Nearby Bridges

Bridge Details

Structure #
B30008800000000
Year Built
2005
Length
23.5 m (77.1 ft)
Max Span
21.3 m
Width
24.8 m (81.4 ft)
Lanes
6
Daily Traffic
10,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$347,000
Total Project Cost
$521,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.