CTH K over DES PLAINES RIVER

0.6M E JCT CTH D · County 059, Wisconsin · Built 1991 · 2 Lanes · 7,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B30006900000000
Year Built
1991
Length
33.5 m (109.9 ft)
Max Span
16.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
7,800
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.