STH 158 over CNW RR

0.9 MI E JCT CTH H · County 059, Wisconsin · Built 1958 · 2 Lanes · 16,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B30000200000000
Year Built
1958
Length
46.5 m (152.6 ft)
Max Span
15.2 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
16,700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$815,000
Total Project Cost
$1,222,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.