IH 90 EB-IH 94 EB over STH 82

7.7M E JCT STH 80 TO N · County 057, Wisconsin · Built 2022 · 2 Lanes · 18,375 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
9
Excellent
Substructure
7
Good

Bridge Details

Structure #
B29015400000000
Year Built
2022
Length
64.3 m (211 ft)
Max Span
32.6 m
Width
18 m (59.1 ft)
Lanes
2
Daily Traffic
18,375
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$854,000
Total Project Cost
$1,281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.