IH 90 EB-IH 94 EB over STH 82
7.7M E JCT STH 80 TO N · County 057, Wisconsin · Built 2022 · 2 Lanes · 18,375 vehicles/day
Overall
Deck
7
Good
Superstructure
9
Excellent
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 9 | Excellent |
| Substructure | 7 | Good |
Location
43.796653, -90.056986
This bridge is in worse condition than 23% of bridges in County 057. The average bridge in Wisconsin is 0 years old; this one is 4 years old.
Nearby Bridges
IH 90 WB-IH 94 WB over STH 82
Built 2022
IH 90 EB-IH 94 EB over LEMONWEIR RIVER
Built 2022
IH 90 EB-IH 94 EB over CTH G
Built 1964
IH 90/94 WB over CTH G
Built 2022
IH 90 WB-IH 94 WB over LEMONWIER RIVER
Built 2022
USH 12-STH 16 over CP RR
Built 1950
STH 58-STH 82-UNIO over LEMONWEIR RIVER
Built 1987
CTH N over LEMONWEIR RIVER SLOUGH
Built 1988
CTH N over ONE MILE CREEK
Built 1988
LRD MONROE ST (DEA over LEMONWEIR RIVER
Built 1969
Bridge Details
- Structure #
- B29015400000000
- Year Built
- 2022
- Length
- 64.3 m (211 ft)
- Max Span
- 32.6 m
- Width
- 18 m (59.1 ft)
- Lanes
- 2
- Daily Traffic
- 18,375
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $854,000
- Total Project Cost
- $1,281,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.