STH 82 over WISCONSIN RIVER

0.4M E JCT CTH HH TO S · County 057, Wisconsin · Built 2019 · 2 Lanes · 4,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
B29014100000000
Year Built
2019
Length
491.6 m (1612.9 ft)
Max Span
44.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
4,900
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.