CTH H over LEMONWEIR RIVER

2.5M S JCT STH 21 · County 057, Wisconsin · Built 1992 · 2 Lanes · 336 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
B29009800000000
Year Built
1992
Length
49.3 m (161.7 ft)
Max Span
19.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
336
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.