CTH F over YELLOW RIVER

1.0M E JCT STH 80 · County 057, Wisconsin · Built 1988 · 2 Lanes · 171 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
B29008300000000
Year Built
1988
Length
47.7 m (156.5 ft)
Max Span
23.2 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
171
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.