STH 21-3RD ST over YELLOW RIVER

0.1M E JCT STH 80 · County 057, Wisconsin · Built 1950 · 2 Lanes · 6,900 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
B29000600000000
Year Built
1950
Reconstructed
1999
Length
74.7 m (245.1 ft)
Max Span
28 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
6,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.