IH 94 WB over JOHNSON CREEK

5.4M W JCT CTH F TO N · County 055, Wisconsin · Built 2020 · 2 Lanes · 21,400 vehicles/day

Overall
Fair
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 6 Satisfactory

Location

43.085731, -88.691306

This bridge is in worse condition than 63.7% of bridges in County 055. The average bridge in Wisconsin is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
B28019000000000
Year Built
2020
Length
11.9 m (39 ft)
Max Span
11 m
Width
20.3 m (66.6 ft)
Lanes
2
Daily Traffic
21,400
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.