LRD GREEN ISLE DR over BARK RIVER

0.4M E JCT CTH D · County 055, Wisconsin · Built 1993 · 2 Lanes · 195 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B28007900000000
Year Built
1993
Length
29.9 m (98.1 ft)
Max Span
28.7 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
195
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.